Electrical Reference Library · Technical Reference
PVC Conduit (Schedule 40 and 80)
Rigid PVC conduit comes in Schedule 40 and the thicker-wall Schedule 80. Schedule 80 is the type used where the conduit is exposed to physical damage, and long runs need expansion fittings.
Draft, open for review. Check every value against the governing standard and the manufacturer’s data before use.
What it is
Rigid polyvinyl chloride conduit (PVC) is a nonmetallic raceway covered by NEC Article 352. It is listed to UL 651 and made to NEMA TC 2. Fittings are made to NEMA TC 3. Schedule 40 has a standard wall. Schedule 80 has the same outside diameter with a thicker wall, so the inside diameter is smaller. PVC is light, does not rust and is joined with solvent cement.
How to identify
Electrical PVC is usually gray and printed along its length with "Schedule 40" or "Schedule 80", trade size, sunlight resistance where marked, and the UL listing. Plumbing pipe is usually white and is not listed as electrical conduit. Belled ends on one end of each length are common.
Schedule 40 vs Schedule 80
| Feature | Schedule 40 | Schedule 80 |
|---|---|---|
| Wall | Standard | Thicker |
| Outside diameter | Same as Schedule 80 | Same as Schedule 40 |
| Inside diameter | Larger | Smaller |
| Conductor fill | Use Schedule 40 row in Chapter 9 | Use Schedule 80 row, less fill |
| Physical damage locations | Not for locations subject to damage | Identified for physical damage |
| Fittings | Same fittings fit both | Same fittings fit both |
Expansion fittings
PVC grows and shrinks much more than metal with temperature. NEC 352.44 calls for expansion fittings where the expected length change is 6 mm (1/4 in) or more in a straight run between secured points. Table 352.44 gives the change in length for each temperature range. Common places are rooftop runs, long exterior runs and runs on walls that see sun.
Key points
- Schedule 80 is needed where the conduit is subject to physical damage, such as risers from grade where exposed.
- PVC is not a grounding path. Pull a separate equipment grounding conductor.
- Supports, bend limits and permitted trade sizes are in Article 352. Bends between pull points may not total more than 360°.
- Use PVC cement and follow joint cure times, especially in cold weather.
- Heat-bending needs a proper bender that warms the conduit evenly without scorching it.
Common mistakes
- Using Schedule 40 in a parking lot riser or another exposed damage location.
- Leaving out expansion fittings on long sunny runs, which then bow or pull apart.
- Using plumbing pipe as conduit.
- Filling Schedule 80 as if it had Schedule 40 inside diameter.
Governing standards: NEC Article 352 and Table 352.44; NEC Chapter 9 tables; UL 651; NEMA TC 2 (conduit); NEMA TC 3 (fittings).
Reference only. Verify against the current governing code or standard, the manufacturer's data and the project documents before use. Apps for Distributors disclaims liability arising from reliance on this reference.
More in Technical Reference
- Master Guide to Building Wire TypesTHHN/THWN-2, XHHW-2, RHW-2, USE-2 and other building wire types, how the letter codes decode and where each is usedRef EL-0001
- Breaker Types & Ratings ExplainedMiniature, molded-case, insulated-case and power breakers, GFCI/AFCI, supplementary protectors and what each nameplate rating meansRef EL-0002 · Safety-critical
- Nonmetallic-Sheathed Cable (NM-B)Construction, conductor count, jacket colors by size as an industry convention, and permitted and prohibited usesRef EL-0006
- Underground Feeder Cable (UF-B)Solid-jacket direct-burial cable, how it differs from NM-B and where it is usedRef EL-0007
- Service Entrance Cable (SE, SER, SEU, USE-2)Service and feeder cable styles, aluminum vs copper, and how SER differs from SEURef EL-0008
- Metal-Clad (MC) and Armored (AC) CableInterlocked armor cable types, grounding paths, MC-AP and health-care variantsRef EL-0009